光伏保险丝UL认证-广东优科检测
服务项目 |
光伏保险丝UL认证,UL248,广东优科检测,保险丝UL认证 |
面向地区 |
|
广东优科检测是UL授权的第三方检测机构,UL认可我司测试数据,实验室具备UL248免目击测试资质,可提供光伏保险丝UL认证、测试及技术咨询服务。
光伏保险丝UL认证
光伏保险丝UL认证基本要求---基本结构
UL 248-1;CSA C22.2 NO. 248.1
UL 248-19;CSA C22.2 NO. 248.19
CCN:JFGA/7
光伏保险丝UL认证光伏保险丝UL认证
光伏保险丝UL认证基本要求--- Marking(标记)
4.1 Fuses shall be marked as indicated in the Standard for Low-Voltage Fuses - Part 1: General Requirements, CSA C22.2 No. 248-1 / UL 248-1, with additional requirements provided as follows:
a) The fuse shall be marked, with the letters “PV” or “gPV”; or
b) The text, “Photovoltaic Fuse”.
在保险丝要打上“PV”,“gPV”;或“Photovoltaic Fuse”
4.2 Fuses with integral wiring terminations shall also be marked in accordance with the Standard for Wire Connectors, UL 486A-486B / CSA C22.2 No. 65. The marking may be on the fuse, the smallest unit container, or an information sheet.
保险丝如果配有接线端子,要按照接线端子相关标准的要求打marking(在保险丝上或小包装上)
光伏保险丝UL认证基本要求--- 使用限制
These types of fuses are not intended to protect downstream inverter components, such as capacitors and against the discharge of such capacitors back into the arrays.
不能用于保护光伏逆变器里面的部件例如电容,也不能用来防止这类电容的反灌
The voltage rating may be up to 1500 Vdc
额定电压<= 1500 V dc
不能打上“Current Limiting”的Marking
东莞光伏保险丝UL认证办理流程
1、项目确定:确认试验所依据的UL标准、认证费用与时间、样品数量等
2、资料准备:根据UL的要求,企业准备好认证所需的各项资料或文件;
3、送样测试:企业将样品寄送至的实验室进行产品测试;
4、签发报告:产品检测结果符合UL标准要求,正式签发检测报告;
5、工厂审核:UL将对生产工厂进行工厂检查,以确保符合标准要求;
6、标志使用:审核符合要求后,申请人正式获得授权使用UL标志。
查看全部介绍